INFRASTRUCTURE

Lighting Manufacturing Facilities :

Two state-of-the-art Lighting manufacturing units located at Kashipur (Uttarakhand) and Gwalior (Madhya Pradesh)
One of the few ‘fully backward integrated’ Lighting Companies in India with components manufacturing capability.

Surya Technology & Innovation Centre (STIC) :

Counted amongst one of the top lighting R&D centres in India, the Surya Technology and Innovation Centre (STIC) at Noida caters to Photometric, Electrical, Mechanical, Environmental, and Endurance test requirements for development of latest generation energy-saving luminaires. Additionally, the STIC is also being used to carry out Photometric Optical Testing of the luminaire for quality control. STIC houses the Mirror Goniophotometer from LMT, Germany, an equipment for precise and accurate measurement of the distribution of light in the lamps, luminaires and LED chips, which can be found in technological centres of some of the leading lighting companies in the world. STIC has approvals from DSIR, Govt. of India and accreditation from NABL.

Steel Pipes Manufacturing Facilities :

Surya over four decades stands as a very robust brand in steel pipes and it is one of India’s largest GI pipe manufacturers. The Bahadurgarh plant has a capacity of producing 2,25,000 MT of ERW pipes and 1,15,000 of CR sheets per annum. The Malanpur (Gwalior) plant has a capacity of producing 1,50,000 MT of ERW pipes per annum.

Surya Global Steel Tubes Ltd., an ultra-modern manufacturing plant located in Bhuj, Gujarat and operating under the parent brand Surya Group, spreads over an enormous area of 100 acres. Located just by the national highway at the Bhuvad village (Anjar) in Kutch, within a close proximity to the Kandla/Mundra port, this plant has a capacity of producing ERW pipes with 2,30,000 MT and Spiral pipes of 60,000 MT per annum. Spiral Welded pipes are manufactured here that comes in the range of 18” to 100” with a maximum wall thickness of 1” (25.4mm) conforming to API/ASTM/IS specifications.

Along with that, the under commissioned Steel Pipe plant at Hindupur (A.P) for manufacturing of ERW Black and GI pipes with proposed production capacity of 90,000 MT per annum is also progressing ahead of schedule and commercial production is expected to be in the FY 16-17. With this, we will be able to further leverage and strengthen the presence of the company in the premium markets of South India as we will be able to ensure maximum deliveries in a short period of time.